Daisy: Week 4 Progress

I have been assigned to be part of the 3D modelling team. Due to the site delay, we have also based our early stages of modelling on research.
  • There were approx. 47 of these towers streching across the 3.2km ropeway network.
  • Each timber tower was 8 to 10 metres wall depending on its location.